Cedar Point – Suncor Public Meeting April 18 & 19

Notice of a proposal and public meeting

by Suncor Energy Products Inc. to Engage in a Renewable Energy Project

Project Name: Suncor Energy Cedar Point Wind Power Project  www.suncor.com/cedarpointwind

Project Location: Town of Plympton Wyoming, Lambton County also Lambton ShoresDated at the town of Plympton-Wyoming and Lambton Shores March 17th, 2012  

Suncor Energy Products Inc. is planning to engage in the renewable energy project in respect of which the issuance of a  Renewable Energy Approval (REA) is required. The distribution of this Notice of Proposal and Public Meeting and the Project itself, are subject to the provisions of the Environmental Protection Act of Ontario (Act) Part v.0.1 and the Ontario Regulation 35/09 (Regulation). This notice is being distributed in accordance with Section 15 of the Regulation prior to an application being submitted and assessed for completeness by the Ministry of the Environment.

Meeting Location

April 18         6-9pm   Camlachie Community Centre     6767 Camlachie Rd, Camlachie ON

April 19         6-9pm   Forest Legion Branch 176           58 Albert St, Forest, ON

Project Description:

Pursuant to the Act and Regulation, the facility, in respect of which the project is to be engaged in, is considered to be a Class 4 wind facility. If approved, this project would have a total maximum name plate capacity of 100MW and include up to 62 wind turbines. The project is descibed in the map below. 

Documents for Public Inspection

The draft project description report describes the facility as a Project that will include up to 62 wind turbines. The number of turbines will be dependent upon final selection of make and model of the wind turbine most appropriate for the proposed project. The proposed Project would also include access roads, up to 3 meteorological towers (met towers), electrical collector lines and two substations which would connect the Project with the provincial high voltage transmission system. A written Draft Project Description Report is being made available for public inspection at the Town of Plympton-Wyoming Office (546 Niagara St Wyoming) and on the project website at www.suncor.com/cedarpointwind

Further, Suncor Energy Products Inc. will prepare additional supporting documents in order to comply with the requirements of the Act and Regulation. Written copies of additional draft supporting documents will be made available on the project website for public inspection at least 60 days before the final public meeting.

Project Contact and Information:

To learn more about the project proposal or to communicate concerns please contact:

Dianne Zimmerman
Manager, Strategic Relations, Renewable Energy
Suncor Energy Products Inc.
150 6th Ave. SW
Calgary AB
T2P3E3
telephone (519) 719-9181

project email: cedarpoint@suncor.com

Marnie Dawson
Senior Project Manager
Stantec Consulting Ltd.
70 Southgate Drive Suite 1
Guelph ON
N1G 4P5
telephone (519) 836-6050

About these ads

Posted on March 17, 2012, in Cedar Point Project, Meetings, Suncor and tagged . Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 1,282 other followers

%d bloggers like this: