Bornish Project

Bornish Wind Project
NextEra (Florida Power and Light)
Status – OPA agreement signed

Project documents
News/Posts
Location Maps
Noise Map

45
(1.62MW) GE Wind Turbines

  • Laydown and storage areas (including temporary staging areas) for construction equipment and supplies
  • A substation located on site and a 115 kV transmission line to connect to the Hydro One transmission system
  • The proposed transmission line will travel east along Elginfield and Nairn Roads, connecting to the Hydro One transmission system
  • Underground electrical collection lines (located on private lands) to connect the turbines to the transformer substation
  • Turbine access roads construction and maintenance
  • Permanent meteorological towers (height 80-100m) to measure wind speeds, wind direction, temperature and humidity
  • An operations and maintenance building

 

Dark purple and blue is the wind development, and light purple overlay is the possible transmission area routes.

Map of “old” project area below for refrence. NextEra seems to be starting from scratch again. No turbine placements were available at the transmision meeting, even though this project had been ready to submit for an REA.

Bornish Wind Farm - FPLE Energy - 45 Win Turbines
 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 1,133 other followers