Bornish Project
Bornish Wind Project
NextEra (Florida Power and Light)
Status – OPA agreement signed
Project documents
News/Posts
Location Maps
Noise Map
45 (1.62MW) GE Wind Turbines
- Laydown and storage areas (including temporary staging areas) for construction equipment and supplies
- A substation located on site and a 115 kV transmission line to connect to the Hydro One transmission system
- The proposed transmission line will travel east along Elginfield and Nairn Roads, connecting to the Hydro One transmission system
- Underground electrical collection lines (located on private lands) to connect the turbines to the transformer substation
- Turbine access roads construction and maintenance
- Permanent meteorological towers (height 80-100m) to measure wind speeds, wind direction, temperature and humidity
- An operations and maintenance building

Dark purple and blue is the wind development, and light purple overlay is the possible transmission area routes.

Map of “old” project area below for refrence. NextEra seems to be starting from scratch again. No turbine placements were available at the transmision meeting, even though this project had been ready to submit for an REA.






Leave a Comment