Jericho Project

Jericho Wind Energy Centre
(Forest, Thedford, Lambton Shores, Arkona)
NextEra (Florida Power and Light)

Status: OPA agreement signed, Final meetings complete, project under review

Project Documents
News/Posts

Local contact: Lambton County Concerned Citizens: mike.mahood@xcelco.on.ca

92 (1.62MW) GE Wind Turbines

  • Laydown and storage areas (including temporary staging areas) for construction equipment and supplies
  • A 115 kV transmission line and a transformer substation to connect to the Hydro One transmission system
  • Underground electrical collection lines (on private property) to connect the turbines to the transformer substation
  • Turbine access roads for construction and maintenance
  • Permanent meteorological tower(s) during operation to measure wind speeds, wind direction, temperature and humidity
  • An operations and maintenance building

  1. Concrened citizen

    I dont think this is a good idea. last i checked southwesten ont farm land was the richest land in canada why dont you go up north and bolt them down on a rock… rather then fill our fields with concreat and turbines…

  2. william vanrooy

    jericho ,it says something in the bible about that, and the walls came tumbling down, william j vanrooy

  1. Pingback: Jericho Wind expands into Warwick twp – Public meeting « Middlesex-Lambton Wind Action Group

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 1,282 other followers

%d bloggers like this: