Jericho Project
Jericho Wind Energy Centre
(Forest, Thedford, Lambton Shores, Arkona)
NextEra (Florida Power and Light)
Status: OPA agreement signed, Final meetings complete, project under review
Local contact: Lambton County Concerned Citizens: mike.mahood@xcelco.on.ca
92 (1.62MW) GE Wind Turbines
- Laydown and storage areas (including temporary staging areas) for construction equipment and supplies
- A 115 kV transmission line and a transformer substation to connect to the Hydro One transmission system
- Underground electrical collection lines (on private property) to connect the turbines to the transformer substation
- Turbine access roads for construction and maintenance
- Permanent meteorological tower(s) during operation to measure wind speeds, wind direction, temperature and humidity
- An operations and maintenance building





I dont think this is a good idea. last i checked southwesten ont farm land was the richest land in canada why dont you go up north and bolt them down on a rock… rather then fill our fields with concreat and turbines…
jericho ,it says something in the bible about that, and the walls came tumbling down, william j vanrooy
Pingback: Jericho Wind expands into Warwick twp – Public meeting « Middlesex-Lambton Wind Action Group