Lately, many new projects have popped up in the area. A few have retreated a tad (of course that doesn’t mean much…a lease signed is a lease signed). The OPA lists 126 Wind turbines for Middlesex County. Lambton County has at least double that number proposed. It looks as if the wind developers are trying to pack the area around the transmission lines. 
Below is a map of all the registered projects in Middlesex county and area (more are in the works that we do not know about yet: Please let us know of any new projects).
View – Wind Projects- Middlesex County and Area 2010 in a larger map


—————————————————————-
Adelaide Wind Project
Nextera & TCI Renewables
60000 kW (40 Wind Turbines)
Status: Awaiting ECT

More Information on the Adelaide Wind Proposal here…….      
—————————————————————
Bornish Wind Energy Centre
NextEra (FPL)
73500 kW (50 Wind Turbines)
Status: Awaiting ECT 

More Information on the Bornish Wind Proposal here…….  
—————————————————————–   
Adelaide Wind Power Project
Suncor Energy Products Inc.
40000 kW (~26 WT’s) 
Status: Awaiting ECT
—————————————————————-
Lucan Maximum Breeze-
Maximum Breeze Energy Co-operative
10000 kW (~6 WT’s)
Status: Awaiting ECT
—————————————————————-
Napier Wind Farm
wpd Canada Corp. (has purchased some of IPC’s projects)
Wind turbines 5400 kW (~4 Wind Turbines)
Status: Awaiting ECT      
—————————————————————-  
Strathroy A, B & C Wind Project
NextEra (FPL)
18 Wind Turbines
Status: No progress yet.      
—————————————————————-       
Parkhill Wind Farm
Canadian Hydro 
~25 Wind turbines (30-70MW)
Status: No progress yet.          
More Information on the Parkhill Wind Proposal here……. 
—————————————————————-

Here is a map of what the OPA would like to see in Transmission Expansion.

Transmission expansion: click map to see details.

Transmission expansion: click map to see details.

  What affects us in Middlesex County: 

#6        London Area to Sarnia
“There is a significant amount of existing generation located in the area West of London, including gas, wind, solar and coal. There is also significant interest in additional wind generation development in the area. The inter-tie with Michigan is located here as well. Reinforcement of the transmission system west of London would be required to enable the incorporation of the new renewable generation.”

#10      Huron South Enabler
“One of a number of enabling transmission lines identified for areas throughout the province. These lines will be constructed in areas where there is sufficient developer interest in shared connection facilities and will help to enable an even greater amount of renewable generation.”  

#20      London-Hamilton Area
“As higher levels of renewable generation development occur in the area west of London, the transfer of power from London toward the GTA will increase. When this transfer reaches the capability of the existing transmission system between London and Hamilton, renewable generation development will be limited. New transmission between London and Hamilton would alleviate this restriction and allow for further renewable generation development in London and western Ontario.”

Advertisements

Posted on May 7, 2010, in Adelaide Project- NextEra, Adelaide Project- Suncor, Bornish Project, Lucan Project, Napier Project, Wind Project Proposals. Bookmark the permalink. Leave a comment.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: